Ben Gurion Airport Terminal 3
IAA
Project Description:
Location:
Ben Gurion Airport Terminal 3
construction:
2000-2004
budget:
Over NIS 25 million
Project description:
Integrated fire detection and emergency voice alarm system.
The system includes about 50,000 devices of the detectors, fire call points, IN-OUT modules and an emergency public address system that includes about 10,000 end units such as speakers, strobes and horns. The project includes over 50 control panels, dozens of emergency voice system amplifiers, and hundreds of gas-extinguishing systems - FM-200. The entire system is manufactured according to FM / UL standards and is installed according to the requirements of SSI 1220/3 and NFPA.